ICKEPS - Challange Track
SACE Domain: Planning Solar Array Operations on the International Space Station
Industry partner: NASA Ames Research Center, USA
Problem description provided by:
- Jeremy D. Frank, NASA Ames Research Center, USA
Abtsract: Flight controllers manage the orientation and modes of the eight solar arrays that power the International Space Station (ISS). The task requires generating plans that balance complex constraints and preferences. These considerations include context-dependent constraints on viable solar array configurations, temporal limits on transitions between configurations, and preferences on which considerations have priority.
Download the Problem Specification
Download the Input Data